ENGINEERING & REQUISITION CONSOLE • DURANGO CENTRAL WAREHOUSE

SMAT Technical Quote & Process Simulator

Configure your requisition for Process Equipment, Slurry Pumps & Spare Parts, or Process Control. Generate a printable A4 spec sheet, SAP TSV table, or send your request directly to our engineering team in Durango.

DURANGO ENGINEERING & CENTRAL WAREHOUSE CUSTOMER SERVICE: MON-FRI 08:00 TO 18:00 CST

Request a Quotation for Equipment & Spares

Select the wear parts, wet-end lots (impellers, throatbushes, and volutes), pulp scales, or equipment you need to quote.

1. INPUT CONTROL PANEL • EQUIPMENT CONFIGURATION
01

Circuit, Equipment or Replacement Part

Internal hydraulic diameter (D): 150 mm (6x4 Series)
3 • e4147 Weight: 68 kg • 68.0 kg (Hoist ≥23 kg • LI_shaft=6.13)
Hydraulic Geometry: ØD₂ 380 mm • 5 vanes • Paso 45 mm
Assembly Sequence: 09. Impulsor Cerrado 5 Álabes (Estación 03) (Kit 5:5:4)
Certified Hardness: ≥ 650 HB (Brinell) / 58-62 HRC
Fit Guarantee: 1:1 dimensional fit verified against physical pattern before dispatch. Direct shipping from Durango Central Warehouse.
[REGLA METALÚRGICA] Reinforced cutwater thickness. In slurries with oversize rocks over 12 mm avoid rubber; deploy heavy-section High Chrome A05 alloy.
[RIESGO EVITADO] Prevents split-casing breakthrough perforation and uncontrolled slurry containment spills in plant sumps.
[VARIABLES CRÍTICAS Y SERIE] Discharge peripheral velocity (m/s), piping configuration, top particle size (mm). (Series 4x3 a 10x8)
+ Operating Condition / Field Wear Symptom (5 conditions) ▾
+ Circuit Config (Flotation / Filtration / Lab), Cr27/Rubber Material, V-Belt Arrangement & Mining Unit ▾
[A05] 27% High Chrome White Iron (≥ 650 HB) ≥ 650 HB (60–62 HRC) • u₂ ≤ 32 m/s • Lote 5:5:4
d₈₀ / pH: 1506000 µm • pH 412.5
Lot Parts: Closed 5-Vane Impeller, Monolithic Volute (1-piece), Suction Throatbush, Frame Plate Liner Insert (FPL Insert)
SAG/ball mill discharge, primary hydrocyclone feed, and coarse sharp-edged ore particles.
+ Additional Options: Plant Tag, Internal Folio, 1:1 Tape Measure Match or SMAT Code ▾
QUICK ASSIST:
Worn component or unreadable plate? Old nameplate data or photo for 1:1 match ▾

If slurry flow erased the part number, simply attach a photo with tape measure or provide 2 approximate dimensions; our Durango engineering team provides a 1:1 fit sheet at Central Warehouse.

Confidential data for 1:1 dimensional check in private.
↺ Have a previous SMAT part code or folio? ▾
+ Need custom dimensions or non-catalog equipment? ▾
02

Slurry Hydraulic Transport & Critical Velocity (Durand)

Plant Assistant
▼
Vc:3.02 m/s Sm/Cv:1.40 kg/L (23.3% Cv) HR/IEC:HR 0.96 • Motor 86% Dictated:PU (2.1×)
Working from mineral lab tests or daily tonnage?

No detailed engineering drawings required to request a quote. Our Durango applications team verifies SMAT cell, pump, and filter sizing compatibility as part of your formal technical proposal.

COMMON MINING PRESETS:
Slurry Flow Rate (Q):180 m³/h
Solids Concentration (% Cp):45%
Particle Size (d80):180 µm
Ore Specific Gravity (Ss):2.70
Slurry Acidity / Alkalinity (pH):pH 7.0
Mine Operating Altitude (MASL):2,400 msnm
Patm = 7.66 mca. Adjusted NPSHa margin to prevent altitude cavitation.
Patm = 7.66 mca | -ΔNPSHa = 2.67 m | IEC 60034-1 = 0.860 | K_motor,alt = 1.236x
Critical Velocity (Vc / F_L):3.02 m/s (F_L 1.35)
Actual vs 1.25 Vc:2.83 / 3.77 m/s
Slurry Density (Sm / Cv):1.40 kg/L (23.3% Cv)
Cave Derating (HR / ER):HR 0.96 • ER 0.94
Altitude NPSHa Loss:-2.67 m (Patm 7.66 mca)
Recommended Alloy:High Chrome A05 (>650 HB)
Estimated Life:~2757 h (2.1×)
Kinematics (u₂ / L₁₀ₕ):22.92 m/s • 22,326 h
Pump Speed (n₂) / Radial Load (F_r):1149 RPM • 6.72 kN
Sump Flood Immunity:Elevated Motor (Splash Immune)
Front Impeller–Throatbush Clearance (δ_frontal): 0.75 mm (Δη_v = -0.56%)
5:5:4 (Coupled nominal wear lot) • Vc margin loss: -0.48%
High chrome white iron (≥650 HB, E ≈ 210 GPa) resists suction vacuum hoop stresses as a 1-piece Monolithic Volute + rear FPL Insert + front Throatbush.
Total branch mass: 880.3 kg (9 NIOSH hoists ≥23 kg) • Sequence 01–05 valid
For intermediate cutting slurry (180 µm, V = 2.83 m/s, pH 7.5), Cast Polyurethane U01 (Shore A 85–95) delivers 2.1× higher resistance to directional cutting, hydrocyclone feed, and chemical attack.
Hydraulic Transport Regime (Durand):
Safe Regime / Homogeneous Flow (V > 1.25 Vc) Recommended velocity: >3.77 m/s (Patm 7.66 mca)
Quick Mechanical Symptom & Action Guide:
Hydraulic pinging or gravel noise in pump casing (Cavitation) Check sump submergence. Fit dynamic expeller seal to relieve suction vacuum.
Accelerated abrasive wear and localized grooving on throatbush / volute Precision clearance adjustment or upgrade to High Chrome 27% (A05) >650 HB alloy.
Harmonic vibration and bearing cartridge overheating Dispatch Timken bearing cartridge assembly with shop dynamic balancing inspection in Durango Warehouse.
Continuous slurry leakage and shaft sleeve scoring Install ceramic-coated sleeve or convert to waterless expeller dynamic seal.
SHUTDOWN COST & SHIFT SAVINGS ANALYSIS

Protected Milling Hours vs Unscheduled Shutdown

Estimated Downtime Hours Prevented with Local Stock:4 hrs
Ore / Solids at Risk per Downtime Event:~475 ton
Maintenance Frequency Comparison:
A05 Alloy (>650 HB) projects ~2,400 hrs wear life, avoiding up to ~7 unscheduled shutdowns/yr vs standard iron.
Slurry flow and solids concentration calculation. Having verified spares in Durango prevents line shutdowns and milling losses.
03

Requester Identification & Logistics

2. OFFICIAL SMAT SPECIFICATION • REAL-TIME EMISSION (A4)
SMAT MINERALS MINERAL PROCESSING EQUIPMENT & CRITICAL SPARES Fiscal HQ: Mariano Salas #114, Durango, Mexico ZIP 34166 • Central Warehouse Durango
OFFICIAL FOLIO SMAT-2026-8810 SMAT-PUMP-6X4-WETKIT 2026-09-24
[PARO DE PLANTA / PRIORIDAD] VERIFIED MINING PLANT • PLAUSIBLE PARAMETERS Durango: (618) 810-4408 • WhatsApp: +52 (618) 367-0664 • Lunes a Viernes 08:00 a 18:00 (Hora Centro / Durango)
1. DELIVERY LOCATION & DURANGO DISPATCH
Requester
Lead Process Engineer
Mine / Company
Mining Operation / Company
Direct Contact
+52 (618) 810-4408 • [email protected]
Dispatch Point
Durango Central Warehouse Pickup
2. ENGINEERING SPECIFICATION
Complete Wet-End Kit ≥ 650 HB (Brinell) / 58-62 HRC

1:1 dimensional check on test bench at Durango central warehouse.

1:1 dimensional fit verified against physical pattern before dispatch. Direct shipping from Durango Central Warehouse.

Process Line / Capacity: 6" to 4" Piping (Main Process Slurry) Plant Operating Condition: Pending field assessment (SMAT technical advice requested) Role Acceptance Criteria: 1:1 dimensional fit • Hardness >600 HB • Durango Warehouse availability
3. SLURRY TRANSPORT AUDIT (DURAND-CONDOLIOS)
Flow & Solids: 180 m³/h @ 45% Sólidos (Cp)
Particle Size (d80): d80 = 180 µm (Cuarzo / Abrasivo Grueso)
Durand Critical Velocity (Vc): 2.42 m/s (Margen seguro: 3.02 m/s)
Derating (HR / ηr) & Wear Life: HR = 0.880 | ηr = 0.857 | Est. Life: 2,400 h (3.8x vs FG)
Altitude & IEC Thermal Pincer: Patm = 7.89 mca (-2.44 m NPSHa) | IEC = 0.880 | K_motor,alt = 1.326x
Dictated Metallurgy: Technical metallurgy dictated per slurry severity (Durango)
Axial Clearance & Kinematics: δ = 0.75 mm (Δη_v = -1.6%, ΔV_pipe = -1.2%) | Arreglo CV | u₂ = 22.92 m/s | L₁₀ₕ = 22,326 h | S1→S5 sequence collision-free
Physical Spec / NIOSH: 3 (e4147) | 68 kg (68.0 kg (Hoist ≥23 kg • LI_shaft=6.13)) | ØD₂ 380 mm
4. CENTRAL WAREHOUSE INSPECTION & PROTOCOL
✓ DURANGO BENCH METROLOGICAL VERIFICATION
ISO 1940 Grado G2.5 Acople Brida 1:1 (<0.05 mm) Certified Metallurgy Hardness

SMAT bench assembly warranty. Fiscal HQ & staging yard: Mariano Salas #114, Durango, Mexico ZIP 34166.

Acceso apto para transporte de carga pesada: camión unitario (rabón), torton y tractocamión con plataforma articulada
[TCO / PARO PROTEGIDO] 40,000 USD/hora

Complete Spare Kit investment to prevent unscheduled concentrator shutdowns (Industry benchmark: 40,000 USD/hour in deferred production). Full hydraulic clearance renewal in a single maintenance window.

ERP LINE ITEM & FISCAL DATA
1. NORMALIZED REQUISITION ITEMS (SAP / ERP)
Item Partida / Código SMAT Material / Norma Destino
010 Complete Wet-End Kit SMAT-PUMP-6X4-WETKIT
TAG: CIRCUIT-BOMBEO • SAT: 8413.91.01 • Despacho: Almacén Central Durango
Metallurgy dictated by slurry severity (Durango) Almacén Central Durango
2. VENDOR ONBOARDING FISCAL DATA
Legal Entity: SMAT MINERALS
Fiscal HQ Address: Mariano Salas #114, Col. Primer Presidente, Durango, Dgo. CP 34166
Central Warehouse & Dispatch: Acceso apto para transporte de carga pesada: camión unitario (rabón), torton y tractocamión con plataforma articulada
Direct Contact: (618) 810-4408 • WhatsApp +52 (618) 367-0664 • [email protected] • [email protected]
3. TECHNICAL JUSTIFICATION FOR PURCHASE ORDER (SAP / ERP / COUPA)

Critical wear supply with 1:1 dimensional verification at Durango test bench to prevent operational downtime.

▾ View full justification text for SAP/ERP

Critical wear replacement part supply for plant mineral processing circuit. Inspected with 1:1 dimensional fit verification, dynamic test bench balancing, and validated specification at Durango Central Warehouse to prevent unscheduled shutdowns.

[TCO / PARO PROTEGIDO] 40,000 USD/hora

Protection against unscheduled line shutdown: 40,000 USD/hour in estimated deferred production. 24-48h guaranteed dispatch from Durango warehouse with <0.05 mm runout bench check.

SPEC EXPORT & DISPATCH ACTIONS:
SMAT-2026-8810 Certified 1:1 Fit
TECHNICAL & WAREHOUSE CERTAINTY

Frequently Asked Questions on Metallurgy, 1:1 Interchangeability & Dispatch

Direct answers regarding Durango warehouse buffer inventory, shop dynamic balancing, dimensional verification, and High Chrome >650 HB melt certification.

01 What is the delivery lead time and supply model for slurry pump parts from Durango?

High-demand slurry wear parts (A05 impellers, volutes, centrifugal expellers, and stuffing box assemblies) are maintained in inventory buffer at our Durango Warehouse. This allows mining operations to schedule prompt collection with quote folio or overland delivery (24 to 48 hrs across northern and central Mexico mining districts), removing the need for mining teams to tie up working capital or manage lengthy international import logistics.

02 What dynamic balancing tests are performed on slurry pump impellers?

All slurry impellers and rotating components undergo shop dynamic balancing and concentricity inspection on our Durango test rig. Vibration reduction is verified prior to dispatch to protect your plant bearing assemblies.

03 Are your replacement spare parts 100% interchangeable with existing plant pumps?

Yes. Our replacement parts undergo tight metrological verification for 1:1 direct interchangeability with industry-standard frames (4x3 C-AH through 10x8 F-AH series), matching bolt circles, shaft tapers, and suction clearances without field torch modifications.

04 What warranty covers casting defects and wear life in High Chrome A05 alloy?

We back every heat with chemical melt certificates verifying 27% chromium content and 650+ HB Brinell hardness. In the rare event of internal casting blowholes or shrinkage porosity, immediate replacement is executed at our yard without administrative friction.

05 What is the turnaround time for a formal commercial RFQ or quote requisition?

Our engineering team responds to formal quote requisitions within the same business day. For flotation cell projects or dry tailings filter press packages, we formulate preliminary technical-commercial proposals with clear delivery timelines dispatched from Durango.