DURANGO REQUISITION & CENTRAL WAREHOUSE PLANT DESK: MON-FRI 08:00 TO 18:00 CST

B2B Equipment & Spares Requisition

Confirm your SKU list, review attached engineering notes, and dispatch your formal requisition to Durango.

1. WHAT YOU NEED • TRAY & QUICK REORDER
01

Line Items, Identification & Attached Notes

Quick SKU / BOM Reorder (Paste from Excel / SAP)

Paste one or more SMAT SKUs or operational references with qty (e.g. SMAT-PUMP-WETKIT-554 2).

Need to size a circuit station first? ▾
MULTI-ITEM B2B REQUISITION TRAY

Active Line Items & Priority Dispatch Routing

DURANGO DISPATCH PRIORITY HEADER: [SMAT-DGO] [DRAFT NO ITEMS | 0 SKUs]
Draft — Empty Tray • Add SKUs to assign SLA
+ Add additional SKUs to requisition (optional) ▾
SKU / Code Technical Description Qty Operating Regime Action
No additional items in tray. Add SKUs above or from /en/products/ sheets to consolidate your order.
2. OFFICIAL SMAT SPECIFICATION • REAL-TIME EMISSION (A4)
SMAT MINERALS MINERAL PROCESSING EQUIPMENT & CRITICAL SPARES Fiscal HQ: Mariano Salas #114, Durango, Mexico ZIP 34166 • Central Warehouse Durango
OFFICIAL FOLIO DRAFT (UNASSIGNED) SMAT-PUMP-6X4-WETKIT 2026-11-24
Draft — No Active Items (P0) Budget: Operating Wear Spares DRAFT IN PROGRESS Durango: (618) 810-4408 • WhatsApp: +52 (618) 367-0664 • Monday to Friday 08:00 to 18:00 (Central Time / Durango)
1. DELIVERY LOCATION & DURANGO DISPATCH
Requester
Pending entry
Mine / Company
Pending entry
Direct Contact
Pending entry
Dispatch Point
Durango Central Warehouse Pickup
2. ENGINEERING SPECIFICATION
Complete Wet-End Kit ≥ 650 HB (Brinell) / 58-62 HRC

1:1 dimensional check at Durango Central Warehouse.

1:1 dimensional fit verified against physical pattern before dispatch. Direct shipping from Durango Central Warehouse.

Process Line / Capacity: 6" to 4" Piping (Main Process Slurry) Plant Operating Condition: Pending field assessment (SMAT technical advice requested) Role Acceptance Criteria: 1:1 dimensional fit • Hardness >600 HB • Durango Warehouse availability
3.15 m/s • 1.40 kg/L • Dry Expeller (St. 02A) • b₂ 48 mm • C 145 kN • Primary factor: Flow Q
Alloy Rationale: For intermediate cutting slurry (180 µm, V = 2.83 m/s, pH 7.0), Cast Polyurethane U01 (Shore A 85–95) delivers 2.1× higher resistance to directional cutting, hydrocyclone feed, and chemical attack.
Bearing Frame: Frame Series D (Cartridge DAM005 H7 • 55 kW @ 1149 RPM • -22% Core Trade-In Eligible)
Axial Collision Check: No axial interference S1→S5 within tolerance.
Engineering Recommendation: Riesgo de sedimentación: velocidad inferior al límite de Durand. Aumente caudal o reduzca diámetro para evitar taponamiento en la tubería.
Build Advance Terms: 50% • Site Witness Protocol: On-site 1:1 dimensional verification with master template and hardness check prior to cargo tie-down
3. SLURRY TRANSPORT AUDIT (DURAND-CONDOLIOS)
Flow & Solids: 180 m³/h @ 45% Solids (Cp)
Particle Size (d80): d80 = 180 µm (Quartz / Coarse Abrasive)
Durand Critical Velocity (Vc): 2.42 m/s (Safe margin: 3.02 m/s)
Derating (HR / ηr) & Wear Life: HR = 0.880 | ηr = 0.857 | Est. Life: 2,400 h (3.8x vs FG)
Altitude & IEC Thermal Pincer: Patm = 7.89 mca (-2.44 m NPSHa) | IEC = 0.880 | K_motor,alt = 1.326x
Dictated Metallurgy: Technical metallurgy dictated per slurry severity (Durango)
Axial Clearance & Kinematics: δ = 0.75 mm (Δη_v = -1.6%, ΔV_pipe = -1.2%) | CV Arrangement | u₂ = 22.92 m/s | L₁₀ₕ = 22,326 h | S1→S5 sequence collision-free
Physical Spec / NIOSH: 3 (e4147) | 68 kg (68.0 kg (Hoist ≥23 kg • LI_shaft=6.13)) | ØD₂ 380 mm
Circuit Telemetry & Reorder: Suggested preventive cycle: 90 days • Durango Scheduled Dispatch
Primary Driver & Physical Bounds: Flow dominant • Parameters within physical bounds
4. CENTRAL WAREHOUSE INSPECTION & PROTOCOL
DURANGO CENTRAL WAREHOUSE METROLOGICAL VERIFICATION
Durango Check: (A, B, C) Triplet ISO 2768-m • 1:1 Flange Coupling Foundry Origin: ISO 1940 Grade G2.5 (<0.05 mm) Certified Metallurgy Hardness (ASTM A532 ≥650 HB)

SMAT 1:1 dimensional fit warranty (physical verification of A, B, C Geometric Triplet under ISO 2768-m). Fiscal HQ & staging yard: Mariano Salas #114, Col. Primer Presidente, Durango, Mexico ZIP 34166.

Heavy freight yard access: rigid trucks, tandem haulers, and articulated flatbeds
[TCO / PROTECTED UPTIME] 40,000 USD/hour

Complete Spare Kit investment to prevent unscheduled concentrator shutdowns (Industry benchmark: 40,000 USD/hour in deferred production). Full hydraulic clearance renewal in a single maintenance window.

ERP LINE ITEM & FISCAL DATA
1. NORMALIZED REQUISITION ITEMS (SAP / ERP)
Item Line Item / SMAT Code Material / Spec Destination
010 Complete Wet-End Kit SMAT-PUMP-6X4-WETKIT
TAG: CIRCUIT-BOMBEO • SAT: 8413.91.01 • Dispatch: Durango Central Hub
Metallurgy dictated by slurry severity (Durango) Durango Central Warehouse
2. VENDOR ONBOARDING FISCAL DATA
Legal Entity: SMAT MINERALS
Fiscal HQ Address: Mariano Salas #114, Col. Primer Presidente, Durango, Dgo. CP 34166
Central Warehouse & Dispatch: Heavy freight yard access: rigid trucks, tandem haulers, and articulated flatbeds
Direct Contact: (618) 810-4408 • WhatsApp +52 (618) 367-0664 • [email protected] • [email protected]
CFDI 4.0 / Anexo 22 Tax Validation: SMAT-PUMP-6X4-WETKIT | SAT ProdServ: 40142000 | SAT Unit • Piece (H87) | TIGIE: 8413.91.99.00 | UNSPSC: 40151500
3. TECHNICAL JUSTIFICATION FOR PURCHASE ORDER (SAP / ERP / COUPA)

Critical wear supply with 1:1 dimensional verification at Durango Central Warehouse to prevent operational downtime.

▾ View full justification text for SAP/ERP

Critical wear replacement part supply for plant mineral processing circuit. Inspected with 1:1 dimensional fit verification, metrological concentricity check, and validated specification at Durango Central Warehouse to prevent unscheduled shutdowns.

[TCO / PROTECTED UPTIME] 40,000 USD/hour

Protection against unscheduled line shutdown: 40,000 USD/hour in estimated deferred production. Supplied from Durango Central Warehouse (per folio stock check) with <0.05 mm runout bench check.

SPEC EXPORT & DISPATCH ACTIONS:
Export SAP TSV, A4 PDF, 1:1 Fit & Purchasing Link ▾
SLA Commitment: No active SLA until items are added Checkout Lane: Empty Draft (No Line Items) Verdict: Awaiting line items Gate: P0
SMAT-2026-8810 Certified 1:1 Fit