ENGINEERING & REQUISITION CONSOLE • DURANGO CENTRAL WAREHOUSE

SMAT Technical Quote & Process Simulator

Configure your requisition for Process Equipment, Slurry Pumps & Spare Parts, or Process Control. Generate a printable A4 spec sheet, SAP TSV table, or send your request directly to our engineering team in Durango.

DURANGO ENGINEERING & CENTRAL WAREHOUSE CUSTOMER SERVICE: MON-FRI 08:00 TO 18:00 CST

Request a Quotation for Equipment & Spares

Select the wear parts, wet-end lots (impellers, throatbushes, and volutes), pulp scales, or equipment you need to quote.

1. INPUT CONTROL PANEL • EQUIPMENT CONFIGURATION
01

Circuit, Equipment or Replacement Part

Internal hydraulic diameter (D): 150 mm (6x4 Series)
3 • e4147 Weight: 68 kg • 68.0 kg (Hoist ≥23 kg • LI_shaft=6.13)
Hydraulic Geometry: ØD₂ 380 mm • 5 vanes • Paso 45 mm
Assembly Sequence: 09. Impulsor Cerrado 5 Álabes (Estación 03) (Kit 5:5:4)
Certified Hardness: ≥ 650 HB (Brinell) / 58-62 HRC
Fit Guarantee: 1:1 dimensional fit verified against physical pattern before dispatch. Direct shipping from Durango Central Warehouse.
Preventive Plant Cycle: Suggested plant cycle: every 90 days • Durango Scheduled Dispatch
STATION-COUPLED PREVENTIVE REPLACEMENT WINDOW (3 MILESTONES)Session Pulp SG 1.45 • d50 280 µm
SHAFT SLEEVE (STAGE 1)Day 45
IMPELLER + THROAT (STAGE 2)Day 90
VOLUTE + LINER (STAGE 3)Day 180
Recommended reorder window:90 d windowRaw life: 100 d 1.00× (1.00×) Tray: v3
Criticality Mode:
Station 01–02 • 02A/02B Seal, V-Belt & ISO 281 L₁₀ₘₕ Hybrid Branch D: A05 + R55
PUMP SHAFT SPEED 1001 RPM Motor 1775 RPM • Ratio 0.65×
PERIPHERAL TIP SPEED (u₂) 19.9 m/s Within R55/A05 elastic envelope
RADIAL BELT LOAD (Fᵣ) 6.71 kN Evaluated on active drive train
ISO 281 BASE LIFE (L₁₀ₕ) 42,800 h DAM005 bath-lubricated cartridge

CV Arrangement • n₂ = 1001 RPM • u₂ = 19.9 m/s • L₁₀ₕ = 42,800 h

Shaft Ø65 mm • Capacity C ≥ 195 kN • a_ISO Labyrinth 1.25×

[METALLURGY RULE]Reinforced volute discharge tongue thickness. In slurries with oversize rocks over 12 mm avoid rubber; deploy heavy-section High Chrome A05 alloy.
[AVOIDED RISK]Prevents split-casing breakthrough perforation and uncontrolled slurry containment spills in plant sumps.
[CRITICAL VARIABLES]Discharge peripheral velocity (m/s), piping configuration, top particle size (mm). (Series 4x3 a 10x8)
+ Operating Condition / Field Wear Symptom (5 conditions) ▾
+ Scope (Spares / CAPEX), St. 02 Sealing & Metrology Schedule ▾
+ Plant Tag, Internal Folio, 1:1 Tape Measure or SMAT Code ▾
ASSIST:
1:1 Tape Measure Check or Photo▾
Load Previous SMAT Code▾
+ Non-catalog custom equipment▾
02

Slurry Hydraulics, Altitude & Wear Tribology

Plant Assistant
▼
Working from mineral lab tests or daily tonnage?

No detailed engineering drawings required to request a quote. Our Durango engineering team verifies pump & spares compatibility at zero cost.

Vc: 3.02 m/s Sm/Cv: 1.40 kg/L (23.3% Cv) HR/IEC: HR 0.96 • Motor 86% Dictated: PU (2.1×)
COMMON MINING PRESETS:
Slurry Flow Rate (Q): 180 m³/h
Solids Concentration (% Cp): 45%
Particle Size (d80): 180 µm
Mine Operating Altitude (MASL): 2,400 msnm
Patm = 7.66 mca. Adjusted NPSHa margin to prevent altitude cavitation.
Patm = 7.66 mca | -ΔNPSHa = 2.67 m | IEC 60034-1 = 0.860 | K_motor,alt = 1.236x
Patm: 7.66 mca IEC: 0.860 K_alt: 1.236x Penalty: +23.6%
Secondary Slurry Calibration: Ore SG (Ss), pH, Temp & Flange Check ▾
Ore Specific Gravity (Ss): 2.70
Slurry Acidity / Alkalinity (pH): pH 7.5
Critical Velocity (Vc / F_L): 3.02 m/s (F_L 1.35 )
Actual vs 1.25 Vc: 2.83 / 3.77 m/s
Slurry Density (Sm / Cv): 1.40 kg/L ( 23.3% Cv)
Cave Derating (HR / ER): HR 0.96 • ER 0.94
Altitude NPSHa Loss: -2.67 m
Recommended Alloy: High Chrome A05 (>650 HB)
Estimated Life: ~2757 h ( 2.1× )
Dominant Sobol Driver (S₁): Slurry Flow Rate Q
Active Trust Boundary: NONE
For intermediate cutting slurry (180 µm, V = 2.83 m/s, pH 7.5), Cast Polyurethane U01 (Shore A 85–95) delivers 2.1× higher resistance to directional cutting, hydrocyclone feed, and chemical attack.
Hydraulic Transport Regime (Durand):
Safe Regime / Homogeneous Flow (V > 1.25 Vc) Recommended velocity: >3.77 m/s (Patm 7.66 mca)
Quick Mechanical Symptom & Action Guide:
Hydraulic pinging or gravel noise in pump casing (Cavitation) Check sump submergence. Fit dynamic expeller seal to relieve suction vacuum.
Accelerated abrasive wear and localized grooving on throatbush / volute Precision clearance adjustment or upgrade to High Chrome 27% (A05) >650 HB alloy.
Harmonic vibration and bearing cartridge overheating Dispatch bearing cartridge assembly with 1:1 Drop-In Dimensional Fit Guarantee and Batch Traceability in Durango Warehouse.
Stuffing Box Leakage, Slurry Dilution & Shaft Sleeve Scoring (Station 02) Install HVOF WC-CoCr Coated Shaft Sleeve (D075C21, ≥68 HRC) and D4028 Dry Expeller + D4029 Chamber.
Overheating (>85 °C), Oil Contamination & ISO 281 Bearing Cartridge Fatigue (Station 01) Drop-in replacement with DAM005 Complete Bearing Cartridge (SAE 4140 Shaft + ISO 281 Rollers + Labyrinth Seal).
Continuous slurry leakage and shaft sleeve scoring Install ceramic-coated sleeve or convert to waterless expeller dynamic seal.
SHUTDOWN COST & SHIFT SAVINGS ANALYSIS

Protected Milling Hours vs Unscheduled Shutdown

Estimated Downtime Hours Prevented with Local Stock: 4 hrs
Ore / Solids at Risk per Downtime Event: ~475 ton
Maintenance Frequency Comparison:
A05 Alloy (>650 HB) projects ~2,400 hrs wear life, avoiding up to ~7 unscheduled shutdowns/yr vs standard iron.
Slurry flow and solids concentration calculation. Having verified spares in Durango prevents line shutdowns and milling losses.
LIVE TRIBOLOGY SIMULATOR · FINNIE-HUTCHINGS & K_Ic TOUGHNESS

Tip Speed u₂, Toughness K_Ic, Clearance δ & Station 01–05 Verifier

Toughness OK · Series 6x4 · No brittle spalling risk under current kinematic regime.
Recommended Material: 27% High Chrome (A05)
Toughness K_Ic: 18.5 MPa·√m
NIOSH Mass & Rigging: 492 kg · 6 NIOSH ≥ 23 kg
Volumetric Loss Δην: -0.56%
Pipe Margin Loss: -0.48%
Station 01–05 Assembly Sequence, Impeller Torque (Nm) & Geometry ▾
[A05] 27% High Chrome White Iron (≥ 650 HB) ≥ 650 HB (60–62 HRC) • u₂ ≤ 32 m/s • Lote 5:5:4
d₈₀ / pH: 1506000 µm • pH 412.5
Lot Parts: Closed 5-Vane Impeller, Monolithic Volute (1-piece), Suction Throatbush, Frame Plate Liner Insert (FPL Insert)
SAG/ball mill discharge, primary hydrocyclone feed, and coarse sharp-edged ore particles.
Monometallic Cr27 / R55 (-31.8%) Serie: 6x4 Masa: 492.0 kg NIOSH: Hoist Required (>=23 kg) Mat: A05
5:5:4 (Coupled nominal wear lot) • High chrome white iron (≥650 HB, E ≈ 210 GPa) resists suction vacuum hoop stresses as a 1-piece Monolithic Volute + rear FPL Insert + front Throatbush.
Assembly Sequence: Ng=0 interferences • Ns=0 unstable subassemblies • Optimal band 0.5–1.0 mm • Zero Cr27% spalling risk
Total branch mass: 880.3 kg (9 NIOSH hoists ≥23 kg) • Sequence 01–05 valid
03

Requester Identification & Logistics

2. OFFICIAL SMAT SPECIFICATION • REAL-TIME EMISSION (A4)
SMAT MINERALS MINERAL PROCESSING EQUIPMENT & CRITICAL SPARES Fiscal HQ: Mariano Salas #114, Durango, Mexico ZIP 34166 • Central Warehouse Durango
OFFICIAL FOLIO SMAT-2026-8810 SMAT-PUMP-6X4-WETKIT 2026-09-24
[PARO DE PLANTA / PRIORIDAD] VERIFIED MINING PLANT • PLAUSIBLE PARAMETERS Durango: (618) 810-4408 • WhatsApp: +52 (618) 367-0664 • Lunes a Viernes 08:00 a 18:00 (Hora Centro / Durango)
1. DELIVERY LOCATION & DURANGO DISPATCH
Requester
Lead Process Engineer
Mine / Company
Mining Operation / Company
Direct Contact
+52 (618) 810-4408 • [email protected]
Dispatch Point
Durango Central Warehouse Pickup
2. ENGINEERING SPECIFICATION
Complete Wet-End Kit ≥ 650 HB (Brinell) / 58-62 HRC

1:1 dimensional check at Durango Central Warehouse.

1:1 dimensional fit verified against physical pattern before dispatch. Direct shipping from Durango Central Warehouse.

Process Line / Capacity: 6" to 4" Piping (Main Process Slurry) Plant Operating Condition: Pending field assessment (SMAT technical advice requested) Role Acceptance Criteria: 1:1 dimensional fit • Hardness >600 HB • Durango Warehouse availability
3.15 m/s • 1.40 kg/L • Dry Expeller (St. 02A) • b₂ 48 mm • C 145 kN • Sobol Driver: Q
3. SLURRY TRANSPORT AUDIT (DURAND-CONDOLIOS)
Flow & Solids: 180 m³/h @ 45% Solids (Cp)
Particle Size (d80): d80 = 180 µm (Quartz / Coarse Abrasive)
Durand Critical Velocity (Vc): 2.42 m/s (Safe margin: 3.02 m/s)
Derating (HR / ηr) & Wear Life: HR = 0.880 | ηr = 0.857 | Est. Life: 2,400 h (3.8x vs FG)
Altitude & IEC Thermal Pincer: Patm = 7.89 mca (-2.44 m NPSHa) | IEC = 0.880 | K_motor,alt = 1.326x
Dictated Metallurgy: Technical metallurgy dictated per slurry severity (Durango)
Axial Clearance & Kinematics: δ = 0.75 mm (Δη_v = -1.6%, ΔV_pipe = -1.2%) | CV Arrangement | u₂ = 22.92 m/s | L₁₀ₕ = 22,326 h | S1→S5 sequence collision-free
Physical Spec / NIOSH: 3 (e4147) | 68 kg (68.0 kg (Hoist ≥23 kg • LI_shaft=6.13)) | ØD₂ 380 mm
Circuit Telemetry & Reorder: Suggested preventive cycle: 90 days • Durango Scheduled Dispatch
4. CENTRAL WAREHOUSE INSPECTION & PROTOCOL
DURANGO CENTRAL WAREHOUSE METROLOGICAL VERIFICATION
Durango Check: (A, B, C) Triplet ISO 2768-m • Acople Brida 1:1 Foundry Origin: ISO 1940 Grado G2.5 (<0.05 mm) Certified Metallurgy Hardness (ASTM A532 ≥650 HB)

SMAT 1:1 dimensional fit warranty (physical verification of A, B, C Geometric Triplet under ISO 2768-m). Fiscal HQ & staging yard: Mariano Salas #114, Col. Primer Presidente, Durango, Mexico ZIP 34166.

Acceso apto para transporte de carga pesada: camión unitario (rabón), torton y tractocamión con plataforma articulada
[TCO / PARO PROTEGIDO] 40,000 USD/hora

Complete Spare Kit investment to prevent unscheduled concentrator shutdowns (Industry benchmark: 40,000 USD/hour in deferred production). Full hydraulic clearance renewal in a single maintenance window.

ERP LINE ITEM & FISCAL DATA
1. NORMALIZED REQUISITION ITEMS (SAP / ERP)
Item Line Item / SMAT Code Material / Spec Destination
010 Complete Wet-End Kit SMAT-PUMP-6X4-WETKIT
TAG: CIRCUIT-BOMBEO • SAT: 8413.91.01 • Dispatch: Durango Central Hub
Metallurgy dictated by slurry severity (Durango) Durango Central Warehouse
2. VENDOR ONBOARDING FISCAL DATA
Legal Entity: SMAT MINERALS
Fiscal HQ Address: Mariano Salas #114, Col. Primer Presidente, Durango, Dgo. CP 34166
Central Warehouse & Dispatch: Acceso apto para transporte de carga pesada: camión unitario (rabón), torton y tractocamión con plataforma articulada
Direct Contact: (618) 810-4408 • WhatsApp +52 (618) 367-0664 • [email protected] • [email protected]
CFDI 4.0 / Anexo 22 Tax Validation: SMAT-PUMP-6X4-WETKIT | SAT ProdServ: 40142000 | Unit: H87 | TIGIE: 8413.91.99.00 | UNSPSC: 40151500
3. TECHNICAL JUSTIFICATION FOR PURCHASE ORDER (SAP / ERP / COUPA)

Critical wear supply with 1:1 dimensional verification at Durango Central Warehouse to prevent operational downtime.

▾ View full justification text for SAP/ERP

Critical wear replacement part supply for plant mineral processing circuit. Inspected with 1:1 dimensional fit verification, metrological concentricity check, and validated specification at Durango Central Warehouse to prevent unscheduled shutdowns.

[TCO / PROTECTED UPTIME] 40,000 USD/hour

Protection against unscheduled line shutdown: 40,000 USD/hour in estimated deferred production. 24-48h guaranteed dispatch from Durango warehouse with <0.05 mm runout bench check.

MULTI-ITEM B2B REQUISITION TRAY

Active Line Items & Priority Dispatch Routing

DURANGO DISPATCH PRIORITY HEADER: [SMAT-DGO] [PARO DE LÍNEA | C_v=48% Cr27 | 1 SKUs | Ref: SMAT-7A4F-9C12]
Lane: LINE-STOP (IMMEDIATE_PICK) • Response SLA: ≤ 15 min • cμ Index = 4800
SKU / Code Technical Description Qty Operating Regime Action
No additional items in tray. Add SKUs above or from /en/products/ sheets to consolidate your order.
SPEC EXPORT & DISPATCH ACTIONS:
SMAT-2026-8810 Certified 1:1 Fit
TECHNICAL & WAREHOUSE CERTAINTY

Frequently Asked Questions on Metallurgy, 1:1 Interchangeability & Dispatch

Direct answers regarding Durango warehouse buffer inventory, 1:1 dimensional fit verification, and High Chrome >650 HB melt certification.

01 What is the delivery lead time and supply model for slurry pump parts from Durango?

High-demand slurry wear parts (A05 impellers, volutes, centrifugal expellers, and stuffing box assemblies) are maintained in inventory buffer at our Durango Warehouse. This allows mining operations to schedule prompt collection with quote folio or overland delivery (24 to 48 hrs across northern and central Mexico mining districts), removing the need for mining teams to tie up working capital or manage lengthy international import logistics.

02 What dimensional and concentricity inspections are performed on slurry pump impellers?

All slurry impellers and rotating components undergo 1:1 metrological inspection of shaft thread, taper, geometric triplet (A, B, C), and concentricity at our Durango Central Warehouse prior to dispatch to protect your plant bearing assemblies.

03 Are your replacement spare parts 100% interchangeable with existing plant pumps?

Yes. Our replacement parts undergo tight metrological verification for 1:1 direct interchangeability with industry-standard slurry pumps (1.5x1" through 10x8" Suction × Discharge geometries), matching bolt circles, shaft tapers, and suction clearances without field torch modifications.

04 What warranty covers casting defects and wear life in High Chrome A05 alloy?

We back every heat with chemical melt certificates verifying 27% chromium content and 650+ HB Brinell hardness. In the rare event of internal casting blowholes or shrinkage porosity, immediate replacement is executed at our yard without administrative friction.

05 What is the turnaround time for a formal commercial RFQ or quote requisition?

Our engineering team responds to formal quote requisitions within the same business day. For flotation cell projects or dry tailings filter press packages, we formulate preliminary technical-commercial proposals with clear delivery timelines dispatched from Durango.